Projects/ Southeast Portfolio/ Pinecrest Valley/ Interactive Site Assessment
Project Assessment · PV-2026-0417

Pinecrest Valley Solar Project

Real-time interactive layout review for the proposed 42 MW DC fixed-tilt ground-mount PV installation. Adjust panel tilt and row pitch to model inter-row shading loss, ground coverage ratio, and DC energy yield — directly visualized against live solar geometry at lat 35.5°N. Exactly the kind of tool your clients expect to see.

Under Planning Review 42 MW DC COD Target: Q3 2027
GENERATING SITE MODEL
Live Shadow Analysis
ACTIVE · REAL-TIME SIMULATION
Current Power Output
0.0 MW
Solar Time
12:00 PM
Shadow analysis model — solar geometry for lat 35.5°N, June solstice. Drag to orbit · Scroll to zoom. Shadow + Yield

Project Specifications

Site Electrical Environmental Timeline
Site
LocationCedar County, NC
Coordinates35.51°N, 79.18°W
Total Acreage210 acres
Fenced Area185 acres
TerrainGently rolling pasture
Electrical
System Capacity42 MW DC
AC Export34.5 MW AC
DC:AC Ratio1.22
InvertersHuawei SUN2000-215
POI Voltage115 kV
Modules
Module TypeLongi Hi-MO 7
Module Rating585 Wp
Cell TechnologyN-type TOPCon bifacial
Module Count71,795
Module Efficiency22.8%
Mounting
StructureFixed-tilt, ground-mount
Default Tilt25°
Orientation180° (due south)
Row Spacing5.5–7.0 m
FoundationDriven steel piles
Environmental
Annual GHI4.92 kWh/m²/day
Annual DNI5.28 kWh/m²/day
Avg Temperature15.8°C annual
Wind DesignASCE 7-22 · 160 km/h
Flood ZoneZone X (minimal)
Permitting
ZoningConditional Use · RA
InterconnectionDISIS Cluster 14
PPA Off-takerPiedmont Municipal
PPA Term20 years
EPCRFP Phase